line


Logo
                           
 Tudor Road Trail Crossing
                    
2008OBC
2004OBC
OrthotropicWebsites
ASCESacramento
ASCENational
HomePage

TudorRd "For years, the State of Alaska and Municipality of Anchorage had studied ways of crossing the busy, five-lane Tudor Road with a multi-purpose--trail without success. Close proximity to high voltage power lines, buried utilities, close clearance tolerances, and the desire to have a smooth, continuous crossing with grades less than 5% for use by bikers, the handicapped, and sled dog teams presented difficult design problems. The solution ..."


Read more of this article at the AISC site or return to the Orthotropic Bridge Home Page

 

















                                                          ________________________________________________________________________________________________________________________________________________